Appearance
A parent cannot confirm next year
Confirming next year looks like one button, and behind it are two service switches, a dashboard test, a school-year rule and - for Centre and School 1:1 tuition - next year's whole timetable being laid before anything is saved. This is what each refusal means and which of them are yours to clear.
Step 1 of 10
Continue or Change is decided for them, not offered
A family is not given a free choice between carrying on unchanged and changing something. The link they are sent, and the buttons they get, depend on the activity: a plain progression where it can simply roll over, and a change where it cannot.
Two things turn a plain progression into a change: the activity plan has a finish date on it, or the pupil has reached the activity's last school year. So "why is this parent being asked to change rather than continue?" is answered by those two fields, not by anything the parent has done.
Use the arrow keys to move between steps.
Continue or Change is decided for them, not offered
A family is not given a free choice between carrying on unchanged and changing something. The link they are sent, and the buttons they get, depend on the activity: a plain progression where it can simply roll over, and a change where it cannot.
Two things turn a plain progression into a change: the activity plan has a finish date on it, or the pupil has reached the activity's last school year. So "why is this parent being asked to change rather than continue?" is answered by those two fields, not by anything the parent has done.
Two service switches sit above all of it
Nothing is confirmable unless next year is open for progression and the service type progresses activities. Both are yours, and either one off means no family on that service type can carry anything on.
This is the one to check when nobody can confirm rather than somebody. If it is everybody on one kind of activity, it is the service type; if it is everybody full stop, it is the year.
It has to be on their dashboard as ready
Beyond the switches, the activity has to appear in the family's own list of things ready to confirm - theirs as the payer, active, and not finished. An activity that is none of those is not refused so much as absent.
Which is why "it is not on my dashboard" and "it will not let me confirm" are usually the same ticket. Check the payer on the record first: a progression belongs to whoever pays, not to whoever asked.
"This can't be carried on into next year here - please contact the office."
This is the catch-all for all of the above - the switches, the dashboard test, or the school-year rule. It is also what a family sees if they come back to a page they left open while something changed underneath it.
So read it as "work out which of the four", starting with the cheapest: reload their page, then the year, then the service type, then the plan's finish date and school year to.
A Centre or School 1:1 lays next year's lessons as it confirms
For Centre and School 1 to 1 tuition, confirming does not just create next year's record - it lays next year's lessons too, repeating the latest of this year's: the same day, the same local time, the same length, room, location and teachers, from next year's first day.
It is checked before anything at all is saved, so a 1:1 that cannot be laid is refused whole rather than half-done. That is deliberate and it is why these refusals read like timetable problems rather than progression ones.
The four things that stop a 1:1 being laid
In the family's own words - *\"This tuition is not on a plan, so next year's lessons can't be set up from it\"*, *\"The plan has no year for this tuition's academic year\"*, *\"There are no lessons this year to set next year's up from\"* and *\"No lesson dates are free next year for this activity's day and time\"*.
The last is the common one and the least obvious: next year's lessons must fall inside the terms, outside their breaks, never on a bank holiday and never in non-working time. A Monday 4pm lesson can run out of room against next year's term dates while this year's ran perfectly well.
A year that already has lessons is never re-laid
Where next year's plan year exists and already has lessons on it, the confirm leaves them alone. Only an empty year is laid. And confirming twice does not make a second record - it picks the same one up again.
Which is the safe answer to "they clicked it twice". The exception is the one message that says so plainly: "Next year has already been confirmed."
Asking for a remission puts the offer on hold
After confirming, a family may be taken to the remission and subsidy step. Choosing one sends the record to the office to be checked - the family waits, and gets an email saying it has gone in. Choosing none takes them straight on to the offer to accept.
Worth saying on the phone, because a family that ticks a remission "to be safe" has just put themselves in a queue behind your checking. Nothing is lost, but the place is not theirs until you have looked.
Three things the remission step refuses
*\"That remission isn't available.\"* and *\"That subsidy isn't available.\"* mean the one chosen is not on this activity's list - almost always a stale page. *\"Please upload the supporting evidence for this remission.\"* means the remission asks for proof and nothing has been attached yet.
And a family whose payer already has a Free School Meals remission is offered no remission list at all: the record keeps the one it has, and nothing goes for validation. That is correct, not a fault - but it does look like the remission has vanished.
Not carrying on needs a reason, and a term to leave at the end of
Request Finish wants between 1 and 900 characters of reason, and it sets the leaving date to the end of this year's last term - taking the hire with it for a tuition or a group membership.
If this year's terms are not set up, the date cannot be worked out and the family is told to contact the office. That is a data job at your end, not theirs: set the year's terms and the button works.
Why this one is worth knowing
This is the busiest self-service journey in the Portal, and it runs once a year. Every family with an activity meets it in the same few weeks, so a condition that blocks one per cent of them still fills an afternoon — and the message they quote usually names none of the four things that could be wrong.
It is also the journey where your data blocks their action. Three of the refusals on this page are cleared at your end and nowhere else: a year not open for progression, a service type that does not progress, and a year whose terms are not set up. None of them is anything the family can do about.
The messages, and whose job each one is
| What they see | Whose job |
|---|---|
| "This can't be carried on into next year here - please contact the office." | Yours — the year, the service type, the plan's finish date or its last school year |
| "This tuition is not on a plan..." | Yours — a 1:1 with no plan to copy |
| "No lesson dates are free next year for this activity's day and time..." | Yours — next year's terms against that day and time |
| "There are no lessons this year to set next year's up from..." | Yours — nothing to repeat |
| "This year's terms aren't set up, so the leaving date can't be worked out..." | Yours — set the year's terms |
| "Next year has already been confirmed." | Nobody's — it worked the first time |
| "That remission isn't available." | Theirs — reload and choose again |
| "Please upload the supporting evidence for this remission." | Theirs — attach the proof |
The quickest triage is "one family or all of them?"
One family is a record: the payer, the plan's finish date, the pupil's school year. All of them on one kind of activity is the service type. All of them full stop is the academic year not being open for progression. You can usually tell which before opening anything.
A 1:1 confirm is a timetable operation
For Centre and School 1 to 1 tuition, the family pressing Continue lays next year's lessons — on this year's day and time, inside next year's terms, off bank holidays and out of non-working time. It is all checked before anything saves, so nothing lands half-done, but it does mean next year's term dates have to be in before the progression emails go out. A term list that is not ready turns into "it will not let me continue" from every 1:1 family you have.
See also
- Answering the service — what the family sees and the words on each page
- A pupil did not progress into the new year — the office's own automatic progression, which is a different mechanism
- An offer is stuck or declined — where a confirmed progression goes next
- A discount or remission is wrong — remissions, subsidies and what the office checks
